What Is a Change Order in Home Construction?
A change order is a documented agreement between you and your builder that modifies the original scope of work. It describes what is changing, what it will cost, and how it affects the schedule, and it should be approved in writing before the work begins. Change orders are a normal part of custom home construction, and handled well, they let you adjust your home without losing control of the budget.
What separates a manageable change from a costly one is usually the pricing structure behind it. On some contracts, every change raises the builder's earnings. On a flat-fee build, the builder fee is set up front and does not grow because a change costs more.
Common Reasons for Change Orders on a Custom Home
Change orders happen for many reasons, and not all of them are homeowner-driven. Understanding the common causes helps you plan for them during the early stages of your Prescott Valley custom home.
- Design changes, such as enlarging a room, moving a wall, or adding a window
- Finish upgrades that exceed the original allowance
- Site conditions discovered during excavation, such as rock or poor soil
- Plan review comments or code requirements from the permitting authority
- Product discontinuations or long lead times that require a substitute
- Additions to scope, such as a covered patio, built-ins, or an ADU
Some of these, like soil conditions, cannot be fully predicted. Others, like finish upgrades, can be reduced with realistic numbers from the start, as explained in our guide to custom home allowances in Northern Arizona.
How Change Orders Work Under Cost-Plus Pricing
Under a cost-plus contract, the builder adds a markup, often 10 to 20 percent, to trade and material costs. When a change order adds cost, that markup applies to the new work too. A $10,000 change at a 15 percent markup becomes $11,500, and the builder's earnings rise with every change approved. Lyle and Jake Carlson saw homeowners absorb these markups for years, which led them to build a different model, as shared on our About page.
That structure is not inherently dishonest, but it does create a situation where the builder benefits as the budget grows. If you are comparing estimates, our guide on how to compare custom home builder quotes explains how to read the builder fee on each one.
How Change Orders Work Under a Flat-Fee Model
Carlson Construction's Flat-Fee Transparency Guarantee has three parts: one flat fee for planning, permitting, and estimating; one flat monthly construction management fee from groundbreaking through certificate of occupancy; and every trade and material cost billed at cost. Each part affects change orders differently.
Trade and Material Costs Pass Through at Cost
When a change order adds framing, electrical, tile, or any other trade work, you pay the exact amount the trade or supplier charges. There is no percentage stacked on top. The $10,000 change in the example above costs $10,000, and the invoice behind it is the same number on your custom home budget.
The Builder Fee Does Not Grow With the Change
Because the builder fee is fixed, a more expensive change does not raise it. This keeps the conversation focused on what is best for your home rather than what adds to the contract total, which is the core idea behind our flat-fee pricing.
Schedule Impact and the Monthly Management Fee
Construction management is billed as a flat monthly fee. A change that fits within the existing schedule does not change that monthly rate. A change that adds weeks of work can extend the total number of months of construction management. Ask how any proposed change affects the timeline before you approve it, and review our home building services to see what that monthly fee covers.
The Change Order Process, Step by Step
A clear process protects both you and your builder. On a well-managed build, every change follows a consistent path from request to completion. Ask any builder you are considering to walk you through their process during your consultation.
- The change is requested by you, the builder, or the permitting authority.
- The builder gathers pricing from the affected trades and suppliers.
- The schedule impact is reviewed and explained.
- You receive a written summary of scope, cost, and timing.
- You approve or decline the change in writing.
- The budget and schedule are updated, and the work proceeds.
Never let work proceed on a verbal agreement alone. Written approval keeps your budget records accurate and makes it easy to match every cost to its invoice, something we stress with every client building through our new home construction service.
When Change Orders Cost the Most
Timing has a major effect on cost. A wall moved on paper during planning costs almost nothing. The same wall moved after framing means demolition, new framing, and possibly new plumbing or electrical. Moved after drywall, it may also mean patching, painting, and trim work. That is why we recommend finalizing the design selections that affect structure and rough-ins before breaking ground.
Finish changes follow the same pattern. Changing a tile choice before it is ordered is simple. Changing it after installation means removal, disposal, and new labor. Even on a flat-fee build where you pay only at cost, rework is real cost, so early decisions remain the best way to protect your custom home budget.
Owner-Requested Changes vs. Unforeseen Conditions
Not every change order starts with you. It helps to separate owner-requested changes, which come from your own design or finish decisions, from unforeseen conditions, which arise from the site, the plan review, or product availability. Each type is handled through the same written process, but they call for different planning strategies on a custom home build.
Owner-requested changes are the easiest to control. Most can be avoided or reduced by finishing your floor plan and key selections before construction starts. If you do decide to change something mid-build, ask for the full cost and schedule impact first, then decide with complete information. On a flat-fee build, you can weigh that decision knowing the builder fee will not grow because of it.
Unforeseen conditions are harder to predict, but they can be reduced. A careful site evaluation, accurate plans, and early coordination with the permitting authority lower the odds of a surprise. When one does occur, a clear, at-cost change order keeps the response transparent. This is one reason homeowners across our Northern Arizona service areas value owner-led oversight, with Lyle and Jake Carlson involved from the first site visit through final walkthrough.
How to Reduce Change Orders on a Prescott Valley Build
Most avoidable change orders trace back to decisions that were not made early enough. The steps below help keep your build on schedule and your budget predictable, and they apply across all of our service areas.
- Finalize your floor plan, window layout, and structural details before permitting.
- Make selections that affect plumbing, electrical, and HVAC rough-ins early.
- Set allowances based on real pricing for the finishes you want.
- Walk the lot with your builder to identify site conditions in advance.
- Bring complete information to your first meeting, as covered in our guide on what to bring to your first builder consultation.
Site conditions in Prescott Valley and the surrounding area can include rocky ground and varied soils, so a thorough site evaluation before pricing reduces the chance of surprises during excavation. Our team reviews grade, soil, access, and views as part of every custom home construction project.
Building in Prescott Valley With Carlson Construction
Carlson Construction is a licensed, bonded, and insured Arizona residential contractor (ROC #364923) building custom homes in Prescott Valley, Prescott, Chino Valley, Dewey-Humboldt, and across Northern Arizona. Owners Lyle and Jake Carlson lead every project personally, bringing a combined 40 years of building experience and a single point of contact from consultation to keys in hand.
If you want change orders handled with at-cost billing and a builder fee that never grows with your budget, request a free, no-obligation quote or call (928) 800-2421. You can also see finished work on our projects page or start at our homepage.